Böblingen, Germany
Period: | Jul. 2017 to Sep. 2017 |
Client: | RBB joint waste management authority |
Project description: | Residual waste incineration plant, consisting of 2 units with grate firing for combustion of residual waste as primary energy. Both the units supply power and heat for the communities Böblingen and Sindelfingen. |
Tasks: | Investigations regarding an optimized refurbishment of the existing heating surfaces to reduce the current caking at the superheater 1 and 2 to an acceptable degree. Therefore, the incurred flue gas temperatures were found out by use of an own proven boiler calculation program. Furthermore, bill of materials, cost calculation and scheduling with respect to required measures have been performed. |