Evora, Portugal

Period: May 2013
Client: STEAG, Germany
Project description:

The plant is installed from Siemens for Research and Development.

Special feature: Molten salt in the Parabolic trough as heat transfer medium.

The plant is installed from Siemens for Research and Development.

Special feature: Molten salt in the Parabolic trough as heat transfer medium.
Tasks: Site survey and Technical Due Diligence (TDD) with respect to a Parabolic Trough Solar Power Plant as well as to investigate the feasibility of the Project for participation by STEAG with equity as well as to perform the operation and maintenance works by STEAG.

Zenica, Bosnia- Herzogowina

Period: Apr. 2013 to Jul. 2014
Client: KTG
Project description:

Owner’s Engineer during the proposal period, bid evaluation and planning (by Chinese Company SEPCO III) of a new Combined Cycle Power Plant (CCPP), provided as a 2-2-1 configuration with a total capacity of about 350 MWel and a 60 MW district heating facility.

Plant configuration:

Two GE-gas turbine Frame 9E with DryLowNOx (DLN) combustor, two Chinese supplied waste heat boiler 2-pressure drum boiler, one Dong-Fang-steam turbine. two auxiliary boilers for back-up for the 90MWth district heating system.

Owner’s Engineer during the proposal period, bid evaluation and planning (by Chinese Company SEPCO III) of a new Combined Cycle Power Plant (CCPP), provided as a 2-2-1 configuration with a total capacity of about 350 MWel and a 60 MW district heating facility.

Plant configuration:

Two GE-gas turbine Frame 9E with DryLowNOx (DLN) combustor, two Chinese supplied waste heat boiler 2-pressure drum boiler, one Dong-Fang-steam turbine. two auxiliary boilers for back-up for the 90MWth district heating system
Tasks: Consultancy, technical evaluation and supervision of the Chinese EPC contractors engineering works as well as all site activities on behalf of the owner. Thermodynamic and other various calculations, evaluations, and write reports and recommendation to the owner.

Republic of South Africa, (RSA)

Period: Jan. 2012 to Apr. 2013
Client: ESKOM, RSA
Project description:

Investigations, consultancy in a team of specialists and working out respective measures regarding an efficiency improvement for each of ESKOM’s 10 existing bituminous coal fired power plants. The works have been settled for 4 (four) continuous local actions in RSA, duration of each 6 weeks.

 

Each of the 10 Eskom’s power plants consists of 6 to 10 steam generators and 6 to 10 condensing steam turbines, depending on the design and the year of construction, including the respective Balance of Plant (BoP)

Target of the works: improving unit heat rates by 1 % in minimum of the total power plant heat rate.

Investigations, consultancy in a team of specialists and working out respective measures regarding an efficiency improvement for each of ESKOM’s 10 existing bituminous coal fired power plants. The works have been settled for 4 (four) continuous local actions in RSA, duration of each 6 weeks.

Each of the 10 Eskom’s power plants consists of 6 to 10 steam generators and 6 to 10 condensing steam turbines, depending on the design and the year of construction, including the respective Balance of Plant (BoP)

Target of the works: improving unit heat rates by 1 % in minimum of the total power plant heat rate.
Tasks: Thermodynamic calculations, evaluations, survey of feasible measures for improvement with respect to the found measures for improvement. Preparation of a final report.

Last update: Monday, 05. September 2022 - 11:29 o'clock
© 2024 · Ingenieurbüro Manfred Schesack

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.