Ncondezi, Mozambique, Africa

Period: 2012 to 2012
Client: Ncondezi coal company
Project description:

Feasibility study, performed by an African consultant, regarding a coal-fired power plant, consisting of 12 units, each 300 MWel, designed as a CFB based power plant, fuel bituminous coal.

Chosen: installation of a coal-fired power plant, consisting of 2 units, each 150 MWel, designed as a CFB based power plant, fuel bituminous coal.

Feasibility study, performed by an African consultant, regarding a coal-fired power plant, consisting of 12 units, each 300 MWel, designed as a CFB based power plant, fuel bituminous coal.

Chosen: installation of a coal-fired power plant, consisting of 2 units, each 150 MWel, designed as a CFB based power plant, fuel bituminous coal.
Tasks: Double check and evaluation of the feasibility study with respect to a final installation of 12 x 300MWe power plants with CFB steam generators in two periods. Consultancy regarding procurement / installation of the chosen coal-fired power plant, consisting of 2 units, each 150 MWel, designed as a CFB based power plant, fuel bituminous coal.

Braunschweig, Germany

Period: Oct. 2012 to Feb. 2013
Client: BS - Energy
Project description:

Long-term maintenance concept for 5 separate locations in Braunschweig, comprising 1 subcritical 220 t/h bituminous coal fired and 1 subcritical 110t/h gas fired steam generator as well as 3 saturated steam generators (2 x 60t/h and 1 x 30 t/h), 15 several hot water boilers, 2 diesel engines and 2 gas turbine plants with boilers.

Tasks: Technical Due Diligence (TDD) with respect to the conditions of the available installations, cost estimations, recommendations regarding long term maintenance works.

Krefeld, Germany

Period: Dec. 2012 to Sep. 2013
Client: Currenta
Project description:

Technical Due Diligence (TDD) and commercial evaluation of 2 existing supercritical bituminous coal fired steam generators, each 175t/h steam production.

Furthermore, a Technical Due Diligence (TDD) regarding an existing 90t/h residual gas fired steam generator with respect to substitutions for new installation under the view of very strong emission requirements in future.

Both the types of steam generator were investigated under the view of a substitution by new one or further use for operation.

Technical Due Diligence (TDD) and commercial evaluation of 2 existing supercritical bituminous coal fired steam generators, each 175t/h steam production

Furthermore, a Technical Due Diligence (TDD) regarding an existing 90t/h residual gas fired steam generator with respect to substitutions for new installation under the view of very strong emission requirements in future.

Both the types of steam generator were investigated under the view of a substitution by new one or further use for operation
Tasks: Survey regarding the conditions of existing equipment, cost estimation, working out of feasible suggestions for improvements and writing a report.

Last update: Monday, 05. September 2022 - 11:29 o'clock
© 2024 · Ingenieurbüro Manfred Schesack

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.