Ncondezi, Mozambique, Africa
Period: | 2012 to 2012 |
Client: | Ncondezi coal company |
Project description: | Feasibility study, performed by an African consultant, regarding a coal-fired power plant, consisting of 12 units, each 300 MWel, designed as a CFB based power plant, fuel bituminous coal. Chosen: installation of a coal-fired power plant, consisting of 2 units, each 150 MWel, designed as a CFB based power plant, fuel bituminous coal. Feasibility study, performed by an African consultant, regarding a coal-fired power plant, consisting of 12 units, each 300 MWel, designed as a CFB based power plant, fuel bituminous coal. Chosen: installation of a coal-fired power plant, consisting of 2 units, each 150 MWel, designed as a CFB based power plant, fuel bituminous coal. |
Tasks: | Double check and evaluation of the feasibility study with respect to a final installation of 12 x 300MWe power plants with CFB steam generators in two periods. Consultancy regarding procurement / installation of the chosen coal-fired power plant, consisting of 2 units, each 150 MWel, designed as a CFB based power plant, fuel bituminous coal. |