Inowroclaw, Poland
Period: | Jan. 2017 ongoing |
Client: | Chiech Soda Production Site |
Project description: | Increase of steam production of about 25% of each of the four existing Steam Generators, commissioned in 1978. Target was the increase of each steam generator to realize an operation with 3 Steam Generators for the supply the required steam demand of the whole Soda plant. One steam generator shall be in stand by (n – 1 principle). |
Tasks: | Investigations, evaluation, checks and detailed works with respect to the received As-Built documentation, incl. operation mimics as well as confirmations during local visits to establish the measures of fitness for use in case of the intended increase of steam production. Several thermodynamic calculations. Edition of a final report, comprising recommendations for required implementations. |