Region Zulia, Venezuela
Period: | 2004 to 2007 |
Client: | MAN Ferrostaal Power Industry, Essen, Germany |
Project description: | An Extension to a 550 MWel Combined Cycle Power Plant (CCPP) by the use of 2 existing GE gas turbines Frame 7FA (each 175 MWel), 2 additional Heat Recovery Steam Generators (HRSG) from NEM (NL) and 1 new steam turbine from Toshiba (185MWel). The cooling is performed directly from the Maracaibo sea. |
Tasks: | Implementation of 2 HRSGs (triple pressure with reheat) in an existing GT plant, operating in an open cycle. |