x (x)
x (x)
x (x)
x (x)

Dobrotvor, Ukraine

Period: 2003
Client: RWE, Solutions, Duisburg, Germany
Project description:

Study and investigation about the completion of a 230 MW bituminous coal fired power plant , approx. 40 % installed.

Tasks: Technical Due Diligence (TDD) with respect to the conditions of the available installations as well as the equipment in the stores.

Wuppertal, Germany

Period: Dec. 2003 to Jan. 2007
Client: MAN Ferrostaal Power Industry, Essen, Germany
Project description:

Combined Cycle Power Plant 90 MWel and steam supply for feeding into the existing district system of the Wuppertaler Community. Brownfield installation as well as built a new hall for the installation of the gas turbines and Heat Recovery Steam Generators.

2 new gas turbines H25 from Hitachi (each 30 MWel) 2 new once through steam generators from the Kanadien Supplier IST, 3 new gas compressors and the refurbishment of the existing ABB extraction / condensation steam turbine.

Special feature: the start-up of once through steam generators is in dry condition. Feed water is introduce to economizer at 400°C GT exhaust temperature.

Tasks: Deputy Project Manager Power Plant Technology and engineer consult Boiler technology. Generation of the approval documents for the officials.

Abu Dhabi, Taweelah A1, United Arab Emirates

Period: 2000 to 2003
Client: Total Fina Tractebel, Abu Dhabi
Project description:

Extension of an existing Co-generation/Desalination plant up to 1.400 MWel and a potable water production of about 320.000 m³ per day. 

Substitution of three existing Heat Recovery Steam Generators (HRSG) downstream three existing gas turbines by three new HRSG and five new HRSG downstream five new gas turbines. Each of all HRSG are provided with a Supplementary Firing (SF) for doubling the steam production.

Main components:

  • 3 refurbished and 5 new GTs Frame 9E from GE
  • 8 new HRSG in total from NEM, NL
  • 3 backpressure steam turbines from ABB

Desalination plant from SIDEM, France

Tasks: Thermodynamic calculations for double check. Supervision of Engineering, shop expediting, incl. QA / QC, guidance of erection and support during commissioning. Trouble shooting and investigations regarding damages inside the HRSG, caused by the SF, route causes in the burner and insulation areas. Recommendations and realization of technical solutions for trouble shooting.

Last update: Monday, 05. September 2022 - 11:29 o'clock
© 2024 · Ingenieurbüro Manfred Schesack

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.