x (x)
x (x)
x (x)
x (x)

Various, Europe, USA, South America and South East Asia

Period: 1996 to 2003
Client: Babcock, Germany Energie Anlagenbau
Project description:

Various turn-key power plant projects in Europe, USA and South America, South East Asia.

Tasks: Conceptual investigations, basic design and thermodynamic calculation of fossil fired power plants. Preparation of bill of materials, cost estimations and time schedules regarding start of the project until commercial operation.

Duisburg, Leverkusen and Moabit, Germany

Period: 1991 to 1992
Project description:

In total 4 (four) complete CFB boiler units for 120 MWel power plants, Type Lurgi

Fuel: bituminous coal.

Tasks: Project Engineer: Conceptual design, thermal and stress calculations of the pressure parts. The basic design for all components of the steam generators. Preparation of the BoM and cost calculation. Furthermore, preparation of a project time schedule until commercial operation.

Various, Germany

Period: 1991 to 1992
Client: Various power plant owners
Project description:

In total 4 (four) Circulated Fluidized Bed (CFB) boilers (Lurgi Type) each for a 120 MWel power plant.Fuel: bituminous coal.

Tasks: Evaluation of the feasible design, thermodynamic calculations and stress calculation of the pressure parts. Basic design for all components of the steam generator. Preparation of bill of materials, cost estimations, shop expediting, site supervision and time schedules regarding start of the project until commercial operation.

Last update: Monday, 05. September 2022 - 11:29 o'clock
© 2024 · Ingenieurbüro Manfred Schesack

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.