Hürth, Germany

Period: 1991 to 1992
Client: RWE, Essen, Germany
Project description:

Integration of a HRSG for a 400 MWel CCPP, GT fired with gasified lignite.

Tasks: Evaluation of the feasible design, thermodynamic calculations and stress calculation of the pressure parts. Basic design for all components of the steam generator. Preparation of bill of materials, cost estimations, shop expediting, site supervision and time schedules regarding start of the project until commercial operation.

Italy, Spain, India and USA

Period: 1991 to 1996
Client: Babcock, Germany (boiler department)
Project description:

Engineering trainer, know how transfer to subsidiaries.

Tasks: Detailed training (know how transfer) in subsidiaries as per demand or scheduled. Target: Safeguarding of a mutual technical understanding and harmonized course of actions.

Faisalabad/Kotri, Pakistan

Period: 1988 to 1989
Client: WAPDA
Project description:

8 HRSGs for Faisalabad and 4 HRSGs for Kotri, each downstream a frame 5 GT (25el MW ISO). Consortium with Toyo Eng. Japan and ABB.

Tasks: Evaluation of the feasible design, thermodynamic calculations and stress calculation of the pressure parts. Basic design for all components of the steam generator. Preparation of bill of materials and cost estimations as well as creation of time schedules regarding start of the project until commercial operation.

Last update: Monday, 05. September 2022 - 11:29 o'clock
© 2024 · Ingenieurbüro Manfred Schesack

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.