Ajmer, Rajasthan, India
Period: | Jan. 2016 to Feb. 2016 |
Client: | Shree Mega Power (SMP) |
Project description: |
Two power Blocks are installed. Each consists of a 150 MWel condensing steam turbines with reheat (OEM Dong Fang, China),an air cooled condenser (ACC) and a circulating fluidised bed (CFB) boiler unit. The main fuel for BMCR is pet-coke, but currently also lignite and fly ash with a heating value on average 340 kJ/kg. Two power Blocks are installed. Each consists of a 150 MWel condensing steam turbines with reheat (OEM Dong Fang, China),an air cooled condenser (ACC) and a circulating fluidised bed (CFB) boiler unit. The main fuel for BMCR is pet-coke, but currently also lignite and fly ash with a heating value on average 340 kJ/kg |
Tasks: | To evaluate the current efficiency and performance of SMP power plant. The comparison of the results with the design figures. Furthermore, the investigation of the current availability and reliability was performed. |