Vadodara, India
Period: | 1986 to 1988 |
Client: | IPCL, Baroda |
Project description: | 3 fired (oil / gas) HRSGs with switch over to fresh air operation, each downstream a frame 5 GT (25 MWel ISO). Consortium with Chiyoda Japan and AEG, Essen. |
Tasks: | Evaluation of the feasible design, thermodynamic calculations and stress calculation of the pressure parts. Basic design for all components of the steam generator. Preparation of bill of materials, cost estimations, shop expediting, site supervision and time schedules regarding start of the project until commercial operation. |