Buggenum, Netherlands

Period: 1980 to 1982
Client: PLEM
Project description:

Conversion of one oil /gas fired once through boiler (900t/h with reheat) to a bituminous coal-fired boiler without power restrictions.

Conversion of one oil /gas fired once through boiler (900t/h with reheat) to a bituminous coal-fired boiler without power restrictions
Tasks: Evaluation of the feasible design, thermodynamic calculations and stress calculation of the pressure parts.Special Feature: Modification of the existing convection pass and installation of a further controlled flue gas pass behind the existing boiler house. Basic design regarding the steam generator components such as coal bunker, coal feeder, coal mills, ash disposal, ESP, fans, damper, valves etc. Preparation of bill of materials, cost estimations, shop expediting, site supervision and time schedules regarding start of the project until commercial operation.

Last update: Monday, 05. September 2022 - 11:29 o'clock
© 2024 · Ingenieurbüro Manfred Schesack

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.