Different locations such as Guacolda, Bocamina, Santa Maria and several Combined Cyle Power Plants (CCPP), Chile
Period: | Oct. 2016 to Apr. 2017 |
Client: | CDEC SIC in Chile |
Project description: | Investigations of coal fired power plant, operating in lowest possible loads. Target was down to 10 to 15% electrical output. Reason: Renewable power plants gets the preference for operation instead coal fired units. |
Tasks: | Evaluation of design and operation data to develop measures with respect to reach a possible technical minimum plant load of the respective location. Edition of a final report. |