Different locations such as Guacolda, Bocamina, Santa Maria and several Combined Cyle Power Plants (CCPP), Chile

Period: Oct. 2016 to Apr. 2017
Client: CDEC SIC in Chile
Project description:

Investigations of coal fired power plant, operating in lowest possible loads. Target was down to 10 to 15% electrical output.

Reason: Renewable power plants gets the preference for operation instead coal fired units.

Tasks: Evaluation of design and operation data to develop measures with respect to reach a possible technical minimum plant load of the respective location. Edition of a final report.

Shijiazhuang and Shang An, China

Period: Feb. 2015 to Apr. 2015
Client: Knauf Iphofen
Project description:

Shijiazhuang plant is divided in 2 parts:

East section, there are two CFB boilers and one Slag tap boiler with one wet limestone FGD system.

In West section, there are 4 CFB boilers (410t/h each) with 4 wet limestone FGD systems.

Shang An comprises follow power blocks:

two 350MWel (Stage 1), two 320MWel (Stage 2) +two 620MWel (stage 3) – all provided with wet limestone FGD systems.

Shijiazhuang plant is divided in 2 parts:

East section, there are two CFB boilers and one Slag tap boiler with one wet limestone FGD system.

In West section, there are 4 CFB boilers (410t/h each) with 4 wet limestone FGD systems

Shang An comprises follow power blocks:

two 350MWel (Stage 1), two 320MWel (Stage 2) +two 620MWel (stage 3) – all provided with wet limestone FGD systems
Tasks: Local investigation with respect to the different gypsum qualities, found in Shijiazhuang (worse quality) compared to Shang An (good quality).

Paipa, Colombia

Period: May 2015 to Dec. 2016
Client: STEAG GmbH
Project description:

Existing bituminous coal fired power 160 MWel with reheat including all respective power plant facilities of Paipa power plant. Special feature: Location approximate 2,000m above sea level.

Tasks: Technical development of an additional coal-fired power plant 165 MWel;, for implementation to the existing Paipa, Colombia.

Last update: Monday, 05. September 2022 - 11:29 o'clock
© 2024 · Ingenieurbüro Manfred Schesack

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.