Jharsuguda, India

Period: 2010 to 2011
Client: Sterlite Energy Limited, Vedanda
Project description:

Technical Due Diligence (TDD) of a 4 x 600MWel bituminous coal-fired power plant, delivered by a Chinese company and erected by an Indian subcontractor.

The power plant was partially  in the stage of construction respectively commissioning.

Technical Due Diligence (TDD) of a 4 x 600MWel bituminous coal-fired power plant, delivered by a Chinese company and erected by an Indian subcontractor.

The power plant was partially  in the stage of construction respectively commissioning
Tasks: Investigation of the technical of the power plant performance as well as supporting of STEAG’s O&M staff regarding an optimized operation of the installation. Furthermore, an identification of deficiencies and finally respective recommendations of improvements after respective findings.

Vishakhapatnam (Vishak), India

Period: 2010 to 2011
Client: Hinduja, Mumbai
Project description:

An intended installation of a 2 x 500 MWel coal-fired power plant closed to the sea. Direct seawater cooling of the steam turbine condenser and seawater desalination for power plant purposes.

Chosen EPC contractor was BHEL.

An intended installation of a 2 x 500 MWel coal-fired power plant closed to the sea. Direct seawater cooling of the steam turbine condenser and seawater desalination for power plant purposes.

Chosen EPC contractor was BHEL.
Tasks: Technical Due Diligence (TDD) of the intended coal-fired power plant project to investigate the feasibility of the project regarding the participation by STEAG with equity as well as to perform the operation and maintenance works by STEAG.

Duisburg, Walsum 10, Germany

Period: 2010 to 2011
Client: STEAG, Germany / EVN, Austria
Project description:

Problems of an ultra-supercritical steam generator in a 780 MWel power plant with an already installed new pressure part material, called T24. Cracks always happen by to high hardness at the tube weld joints which could not reduced, caused by the chosen design.

Tasks: Investigation with respect a change of material by using an own boiler calculation program for the substitution of the already installed critical T24 material against a long standing proven material (e.g. 13CrMo45) for a ultra-supercritical steam generator of a 780 MWel power plant.

Last update: Monday, 05. September 2022 - 11:29 o'clock
© 2024 · Ingenieurbüro Manfred Schesack

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.